Skip to content
Customized RLC Load Bank for UL1741 Anti-Islanding Test
Customized RLC Load Bank for UL1741 Anti-Islanding Test
Customized RLC Load Bank for UL1741 Anti-Islanding Test
Customized RLC Load Bank for UL1741 Anti-Islanding Test

Customized RLC Load Bank for UL1741 Anti-Islanding Test

REXGEAR RLC load bank testing solutions of predictive failure analysis for UPS(uninterrupted power supply), generator, transformers, PV system, inverter etc, to validate the condition and output of such power systems comprehensively. Integrated AC/DC load bank could be made in one unit or separately with different load voltages as per your need for different applications.

RLC load banks applications

  • UL1741 / IEEE1547.1 Compliance Test
  • Battery bank system
  • Energy storage system
  • Energy meter loop load test
  • Data center rack heat simulating
  • PV system Inverter anti-islanding test
  • Voltage regulator, rectifier aging load test
  • Genset, UPS load bank commission testing

Remote Control by PC

RLC load banks loading elements (load bank types)

Alloy resistors, inductors & capacitors loading elements are combined used in RLC load bank as per clients’ need in different applications:

  • Pure resistive AC load bank
  • Pure resistive DC load bank
  • RCD non-linear AC load bank
  • Resistive & inductive combined AC load bank
  • Resistive, inductive & capacitive combined AC load bank

Technical Specifications

Model Resistive, Inductive & Capacitive AC Load Bank
Load Element Stainless steel resistors, Inductor & Capacitor
Load Voltage 3φ4W+G, Y connection:
 110/190V,115/200V, 120/208V,128/220V,132/230V,139/240V 220/380V,
230/400V, 240/415V, 254/440V, 265/460V, 277/480V
(Or other load voltage upon request)
Frequency 50/60Hz
Load Power R (resistive power): upon request
L (inductive power): upon request
C (capacitive power): upon request
Minimum Load Steps Resistive load step: 10W Inductive
load step: 10Var Capacitive loa
step: 10Var
(Or other load step upon request)
Power Factor PF=Leading & lagging 0-1.0 adjustable
Load Accuracy R: ±5%, L: ±10%, C: ±5%
Digital Meter voltage, current, active power, reactive power,
apparent power, power factor, energy, frequency
Mains Power Supply 1 phase 2wire 50/60Hz: AC120V/220V/230V/240V
3 phase 4wire 50/60Hz: AC208V/380V/400V/415V
2 Control Modes 1- Manual control by push button
2- PC software remote control
Wire Connections Copper bus bar for wire connections
Insulation Class F
Fan Noise 75-90dB
Cooling Mode Force-air vertical or horizontal cooling
Work Mode Continuous work
Protections Overheating/buzzer alarm, overheating/over
voltage/current protection, emergency stop button
Ambient Temperature 10℃~+50℃
Mobility By wheels or stationary with forklift pocket
Humidity ≤95%
Altitude ≤2500 meters

RLC load banks protections

Standard protections:

  • Emergency pause operation: one-key stop loading
  • Over temperature alarm/protection: alarm & remove load
  • Fan interlock protection: loading available after fan activated
  • Over voltage protection: alarm & remove load

Optional protections

  • Blower thermal overload protection: alarm & remove load
  • Short circuit protection by fuse (over current protection)
  • Phase sequence protection (for fans with 3phase voltage)
  • Or other functions as requested

RLC load bank control modes

Two control modes available for RLC load banks: The local panel control mode and the PC software remote control mode.

Local panel control mode available as below listed:

  • By contactor
  • By circuit breakerOr other switches as requested

PC software remote control 

RLC load bank remote control communication protocol would be provided for clients’ integrating the load bank into the ATE system

Resistive, Inductive & Capacitive AC Load Bank (RLC)

RLC load banks are mostly used for inverter anti-islanding test experiments which meets the PV & grid inverter testing requirements for islanding prevention detection, work efficiency test, overload protection test, over-current protection test, power factor test, grid current harmonic test, resonance point test, and so on. Both Leading power factor (Capacitive) and lagging power factor (Inductive) could be available with RLC AC load banks.

Only at Rexgear 

Quick Delivery

Technical Support

Fast Shipping